MTA Bridges and Tunnels
Miscellaneous Structural Rehabilitation and Roadway Joints Replacement on Both Northbound and Southbound Roadway at Henry Hudson Bridge
The work consisted of the design of structural rehabilitation and replacement of joints for the entire bridge. SEPC performed in-depth inspection, prepared inspection report, and developed design for structural steel and concrete repairs, designed roadway deck repairs, and performed construction support services.