New York State Department of Transportation
Contract D900040 Region 11 Bruckner Viaduct Deck Replacement Design-Build Project
SEPC provided construction inspection services for this Design-Build project. The work consisted of the replacement of bridge decks, traffic barriers, approach slabs, expansion joints, bearings, and concrete pedestals. As well as the replacement of roadway and underdeck lighting, overhead sign structures, and drainage systems. There were also structural steel and substructure concrete repairs on the ramp NB and the mainline Bruckner Expressway Viaduct and ramps NX, RC, SB, RD and ND.